Finding the spot
The crew measured to find the middle of the top step, so the rail lands right where hands reach for it.
The footing
They lifted the pavers and dug a hole about 25 by 19 inches and 5 inches deep. Rebar was anchored into the pool shell with epoxy to tie the footing to the pool.
Setting the rail
Brass anchors went on the rail, and they were sunk into fresh concrete. The crew leveled the rail before the concrete set.
Finished
Once the concrete was in, the pavers went back around the rail. No water had to be drained, and the pool was ready to use.